Post-Construction Inspections

Routine Annual Inspections

  • These inspections must be conducted by a person familiar with the control measures implemented on site. 
  • Owners or operators must maintain documentation of these inspections.
  • Inspections must also be submitted annually to the city engineer.

Five-Year Comprehensive Inspections

These inspections should be conducted by a professional engineer or landscape architect. They must include: 

  • Facility Type
  • Inspection Date
  • Latitude/longitude and nearest street address
  • SCM owner information (name, address, phone number, and email address)
  • Photographic documentation of SCMs
  • Specific maintenance items or violations that need to be corrected by the SCM owner along with deadlines and reinspection dates
  • A description of current SCM conditions including, but not limited to:
    • Green infrastructure practices, grassy areas, forested areas, buffer areas, growing vegetation, and soil properties
    • Inlet and outlet channels and structures
    • Embankments, slopes, and safety benches
    • Spillways, weirs, and other control structures
    • Any sediment and debris accumulation

Submit Inspections Here Button

  1. Alexandra Thompson

    Stormwater Coordinator